Movies Logo
October 3, 2007

Season 1

Can you build an eco-friendly home in 60 days for £60k? Builder Tommy Walsh decided to find out. Together with his building team, Walsh undertook the project in what he calls the worst summer in the past 50 years, although that might have been a good thing for what he calls the central feature of the house's eco-friendly aspect - a water harvesting tank, intended to supply water to the toilets, dishwasher and washing machine in the two-bedroom, two-storey house. Despite the deluge of rain, the team slogs on, aiming for the 60-day timeframe.

01. Introduction

The DIY guru attempts to build an affordable eco-friendly home in 60 days with a limited budget.

25min
October 3, 2007

02. Installing Rainwater-Harvesting Drainage System

The team installs the rainwater-harvesting drainage system, which supplies the toilets, washing machine and dishwasher.

25min
October 10, 2007

03. Block-And-Beam Floor Delay

With the block-and-beam floor nowhere to be seen, the team tries to come up with a solution to allow the bricklayers to begin their work.

25min
October 17, 2007

04. Damp-Proof Membrane & Thermal Blocks

To improve the house's energy efficiency, a damp-proof membrane is laid to prevent heat loss and thermal blocks are used instead of concrete increasing, the house's thermal efficiency.

25min
October 24, 2007

05. First-Floor Joists & Timber Frame Roof

The joists for the first floor are installed along with the timber frame that forms the basis of the roof. And the team try to eat doughnuts without licking their lips.

25min
October 31, 2007

06. Polyurethane Wall Insulation

Polyurethane wall insulation is added, and the team considers installing supportive wooden pegs called 'nogs'.

25min
November 7, 2007

07. Roof Slates & Solar Panels

The roof slates and solar panels are fitted to the house, and the team learns the property will be the most energy-efficient in the Fens.

25min
November 14, 2007

08. Exterior Cladding & Under-Floor Heating

The house starts to take shape as the exterior cladding is fitted and the under-floor heating is installed.

25min
November 21, 2007

09. Rooms Boarded & Special Water Tank

The rooms are boarded in preparation for plastering, and a special water tank becomes the latest environmentally friendly addition to the project.

25min
November 28, 2007

10. Completing The Project

With the deadline looming, there's still a lot to do. Tommy and the team work on the fitting the staircase, tiling, electrics and plumbing in a bid to complete the project.

25min
December 5, 2007